30.04.2013 |
The unit with electron beam heating equipped with 5 eb guns PGE450 and working gaz
supply system was
assembled. For the very first time in Ukraine the control system with video monitoring and
molten metal level control in the hearth with central concole in the operator's room was
installed.
|